On-Site Cannabis Manufacturing Consulting

We come to your facility, diagnose bottlenecks, upgrade your lab/kitchen setup, install hardware, and implement changes that make you faster, safer, and fully compliant.

We’re a California Type 7 Manufacturer, and one of California’s first. We keep everything in house: full kitchen, joint room, manufacturing and distribution, so our recommendations actually work on the floor, not just on paper.

What We Do

We provide on‑site consulting for local cannabis manufacturing facilities. From small tune‑ups to complete operational overhauls, we assess, plan, and implement, shoulder‑to‑shoulder with your team.

Our Services

Facility Assessments

End-to-end walk-throughs covering material flow, QC checkpoints, sanitation, and documentation control. You get a prioritized findings report and quick-win actions.

Operational Efficiency Improvements

Line balancing, changeover reduction, batch size right-sizing, yield improvement, scrap reduction, and SOP simplification with a clear 30/60/90-day plan.

Lab/Kitchen Setup Optimization

Bench layout, cold/hot zones, storage and staging, tool shadowing, and hygienic design that reduces cross‑contamination risks and speeds throughput.

Equipment Upgrades & Installations

Spec, procure, and install new hardware (fillers, mixers, roll/pack lines, label/verify, scales).

Hands-On Implementation

We don’t just slide a PDF across the table. We move stations, retrain crews, and run pilot lots until the new way sticks.

Engagement Types

Rapid Tune-Up

1 - 2 Days

Focused audit + 10–15 quick wins, light floor changes, SOP edits, and a punch‑list you can finish in a week.

Sprint Implementation

2 - 4 Weeks

Re-layout stations, install/qualify hardware, retrain shifts, and roll out new SOPs with measured results.

Full Overhaul

6 - 12 Weeks

Facility reflow, equipment upgrades, and QA program hardening.

Outcomes We Target

+15-30%

throughput on bottleneck lines

-20-40%

changeover time

-10-25%

COGS per unit (labor + scrap)

Fewer Deviations

cleaner audit trails; faster COAs

Our Process

01

Kickoff Call

Scope, goals, constraints.

02

On-Site Assessment

Walk-through, time studies, risk review.

03

Action Plan

Prioritized changes, budget, & timeline.

04

Hands-On Implementation

Re-layout, install, SOPs, training.

Hardware We Install

Packaging & Labeling

Label printers/validators, checkweighers, heat tunnels/shrink, semi‑auto fillers.

Packaging & Labeling

Lab & Production

Mixers, homogenizers, chillers, carts, racks, shadow boards.

Lab & Production

Instrumentation

Line sensors, counters, and small PLC devices.

Instrumentation

FAQ's

Yes, we stage work to keep revenue lines running, using pilots and off‑shift windows.

Absolutely. We optimize what you own first; we only recommend buys when ROI is clear.

Yes: spec, vendor coordination, install, basic qualification, and training are included in implementation scopes.

We optimize operations and documentation; we’re not a law firm. For legal interpretations, we’ll work with your counsel.